Route 100B Bridge Closure/Replacement Project Begins 8/17

The replacement of the Route 100B bridge in Moretown (just south of the village) is scheduled to begin on August 17th.

The project is now expected to be completed by October 17th. The project’s primary detour is Route 100; the local bypass/detour is North Road (Pony Farm Road in Moretown).

If you are using the local bypass, please drive with consideration and caution. The Town received State funds for maintenance and dust control, as well as for increased speed enforcement.

Please contact Town Administrator Trevor Lashua at [email protected] or (802) 496-2218, x5, with questions.